Technical Configuration#

Depending on the form of workload to be accelerated, there are currently the following :

7x Compute Nodes (CPU Queue)#

  • CPU: 2x Xeon Gold 6230R Cascade Lake (26 core, 2.1GHz)
  • RAM: 128GB Each

2x GPU Accelerated Nodes (GPU Queue)#

  • GPU: Nvidia V100 (32 GB, 5120 CUDA cores)
  • CPU: 2x Xeon Gold 6230R Cascade Lake (26 core, 2.1GHz)
  • RAM: 128GB Each

Master Node (Login Node)#

  • CPU: 1x CPU with 20 cores
  • RAM: 47GB